Waitaki District Council logo Waitaki District Council

NATURALLY BETTER

 
Services A-Z

LIMs and PIMs

Waitaki District Council

LIM and PIMS

 

Which one do I want?

 

   Buying a property - get a LIM

   Doing work on a property - get a PIM



 

Land Information Memorandum (LIM)

Note that LIMs can only contain information known to the council at the time of the report.

A Land Information memorandum (LIM) is a document issued (on payment of a fee) by a Territorial Authority (Council).  Anyone may apply for a LIM, which gives information on any land within the Territorial Authority district, including (among other information) any building consents or other authorisations applying to buildings on the land. (Local Government Official Information and Meetings Act Section 44A).

Information you will receive in a LIM

  • Rates charges
  • Building permits & consents
  • Private utilities (i.e.: sewerage/stormwater)
  • Public utilities (i.e.: sewerage/stormwater/water supply)
  • Any natural water courses
  • Any natural hazards
  • Dangerous goods details (if any)
  • Environmental Health (any licences held)
  • Protected buildings and trees, historic buildings.
  • Planning information eg resource consents, planning ones.
  • Any special characteristics of the land or buildings.
  • Any requisitions issued by the Council within the property.
  • Resource consents issued in the immediate neighbourhood.
  • Compliance schedules, building warrant of fitness.
  •  Swimming pool compliances.

Information you need to include on the application form:

  • Name of applicant, postal address and fax number
  • Street address 
  • Legal description
  • Valuation Number
  • Certificate of Titles

Length of time a LIM takes

  • Up to 10 workings days
  • You can apply for an urgent LIM, which will be processed as soon as possible (subject to availability of staff)

Cost of a LIM

See Building Fees and Charges                     

Applications can be droped off at our offices, faxed (payments must follow) or posted.

The completed LIM report will be faxed if a fax number is supplied (at least 20 pages) and the original posted.

Viewing a property file.

If you wish to view the file personally, then this can be arranged as long as staff are available.  You need to call into our Council offices at 20 Thames Street Oamaru. You will need to fill out the appropriate form and pay a fee.

If you own the property the charge is $10, if you do not own the property the charge is $40.

You can photocopy items out of the property file as long as they are not copyrighted.  There will be a charge for the photocopying.

 LIM Application Form available on the Forms page

 


 

Project Information Memorandum (PIM)

Note that PIMs can only contain information known to the council at the time of the report.

A P.I.M is important if you are going to do work (alterations, additions etc) to a property.

It will tell you what needs to be done for the project to be granted a consent, or outline the reasons the project cannot continue.

A PIM is a project analysis report prepared by Council, with specific relevance to the Council regulations. It includes information from:

  • Planning and Policy department
  • Building and Drainage Inspectors
  • Engineering reports. (Roading, Water, Waste)

The Building Consent - FAQ has more detail about what a PIM will provide.

 

To APPLY for a PIM you need to complete the PIM Application form downloadable from the forms page, and return it to the Council with:

  • 3 sets of drawings
  • a copy of the Certificate of Title,

A PIM DOES NOT give you right to do begin work.  You will still need to apply for a ‘Building Consent’.

The actual cost of the PIM will depend on the 'Value of the Work being done'

The PIM application form is the same as the Building Consent application form.  You must specify that the application is for a PIM

 

 LIM Application Form available on the Forms page

 





  Copyright ©2010 Waitaki District Council, All rights Reserved. Website design: Griffler Enterprises